In a nutshell: I totally agree with you.
I see two points here:
- Giving executable items a logical structure (arrange them in folders)
- Allow the nesting of test suites
Both already are on our roadmap, with the second one already reflected in the database layout.
rights now I can pass or fail every single step but I seems to only see status for the whole test case in the reports.
This is KLAROS 642 - Save the result type for every step in the test case result, as requested by Robert Gröber
hereRegards
Torsten